| Random files - General Photos |

Entrance to Speicher67 viewsThere's a picture of some Arabic dudes on that pillar thing that's halfway busted out.
|
|

Basement Windows26 viewsLooking into the basement from one of its windows.
|
|

About to leave...116 views...on a convoy. We had that HMMWV stuffed.
|
|

House Week 926 viewsWiring in. Insulation done. Front door on. They probably started dry-walling day.
|
|

Front of House26 viewsHere's the house from the front. They haven't cut out any of the window holes from the Tyvek wrap on the first floor, but have for the most part on the second. The only holes in the wrap on the first floor are the garage and front door. The roof is now on and the shingles are down.
|
|

Lot Before Construction23 viewsYep, just an empty lot.
|
|

Basement201 views
|
|

46 views
|
|
| Last additions - General Photos |

9 Week Sonogram76 viewsNov 06, 2011
|
|

Half Bath Lighting139 viewsFeb 28, 2010
|
|

Half Bath Sink166 viewsFeb 28, 2010
|
|

Half Bath Toilet143 viewsFeb 28, 2010
|
|

Basement, No-Flash165 viewsFeb 28, 2010
|
|

Basement201 viewsFeb 28, 2010
|
|

Furnace and Water Heater151 viewsFeb 28, 2010
|
|

Breaker Box136 viewsFeb 28, 2010
|
|